公在厨房要了我中文字幕_狠狠摸狠狠操_乖宝贝我会叫你爽死的视频_毛片一级完整版免费

Today:
首頁 > English > News Gallery > Company Everts > Company News

Dongting Lake Bridge -- The First Pile Cap Cast Successfully

Source:    Date:2014-02-14  

Recently, the No.6 pile cap of the Dongting Lake Bridge of the key control project of Mengxi-Huazhong railway was cast successfully. This is the first pile cap of Dongtinghu Lake Bridge that was cast in-situ successfully, which provide a favorable opportunity for the foundation construction of the pier shaft.

The No.6 pile cap is in rectangular shape, of which the dimension is 24m×9.2m×3.5m. It was cast by layers with one pour of C40 concrete, the total volume of concrete is 773m3.

up:

next: