公在厨房要了我中文字幕_狠狠摸狠狠操_乖宝贝我会叫你爽死的视频_毛片一级完整版免费

Today:
首頁 > English > News Gallery > Company Everts > Company News

MBEC Wins the Bid of Zhangzhou – Yongan Highway Project

Source:    Date:2012-04-26  

MBEC Recently won the bid of Section A3 of subgrade civil construction in Longyan section of Zhangzhou – Yongan highway project in Fujian province. The Accepted Contract Amount is 420 million RMB and construction period is730 days.


This project is dual-way four lanes, the design speed is 80km/h and the width of the subgrade is 24.5m. The total length of the Section A3 is 6010m. The main line of this section includes two bridges with a total length of 444m, five separated tunnels with a total length of 4418m, 5 culvertswith a total length of 250.62m, 2 channels with a total length of 160.23m.

up:

next: